IGNOU MMPN 1 SOLVED ASSIGNMENT
₹80
₹30
MMPN 1: Construction Management -I
| Title Name | IGNOU MMPN 1 SOLVED ASSIGNMENT |
|---|---|
| Type | Soft Copy (E-Assignment) .pdf |
| University | IGNOU |
| Degree | MASTER DEGREE PROGRAMMES |
| Course Code | MBACN |
| Course Name | Master of Business Administration (Construction Management) |
| Subject Code | MMPN 1 |
| Subject Name | Construction Management -I |
| Year | 2026 2027 |
| Session | - |
| Language | English Medium |
| Assignment Code | MMPN 1/Assignment-1/2026 2027 |
| Product Description | Assignment of MBACN (Master of Business Administration (Construction Management)) 2026 2027. Latest MMPN 001 2026 Solved Assignment Solutions |
| Last Date of IGNOU Assignment Submission | Last Date of Submission of IGNOU BEGC-131 (BAG) 2025-26 Assignment is for January 2026 Session: 30th September, 2026 (for December 2025 Term End Exam). Semester Wise January 2025 Session: 30th March, 2026 (for June 2026 Term End Exam). July 2025 Session: 30th September, 2025 (for December 2025 Term End Exam). |
| Format | Ready-to-Print PDF (.soft copy) |
📅 Important Submission Dates
- July 2025 Session: 31st October, 2025
- Session: 1st January, 1970
- July 2026 Session: 1st January, 1970
- Session: 30th September, 2026
Why Choose Our Solved Assignments?
• Guidelines: Strictly follows 2025-26 official word limits.
• Scoring: Designed to help students achieve 90+ marks.
📋 Assignment Content Preview
MMPN 001 (July 2025) - ENGLISH
MMPN001 Construction management 1
Assignment questions
17th July 2025
1. Describe the site planning activities before a building project.
2. Explain the relevance of Computer Aided Design and Drafting software (CADD) in construction. Sketch and label the architectural symbols for construction materials and electrical fittings (10 each).
3. Explain the various methods for measuring earthwork
4. Describe the site organization procedure in a construction project in your city/nearest urban center.
5. Explain the following
a) Long and short wall or "out-to-out" or "in-to-in" method
b) Centre line method
c) Crossing method
6. Explain the various methods to calculate depreciation
different types of contract? 7. What is the difference between Tender and Contract? What are the
10 marks
8. Explain mediation and arbitration processes in construction industry. What are some of the relevant legal provisions?
9. Explain the process of prequalification of tender. What are the advantages and disadvantages of prequalification of bidders
10. Briefly explain the terms
a. Partial payments
b. Retention money
c. Acceptance of work
d. Liquidated damages
e. Professional liability insurance
MMPN 001 (July 2026) - ENGLISH
MMPN001 Construction management 1
Assignment questions 12th August
2026
1. Suppose you are the project manager for the construction of a residential
apartment in busy street in New Delhi. An existing two storey house in the
site has to be demolished and a new apartment of four floors has to be built
in its place. The new building shares common walls with buildings on the
adjacent plots. Explain the safety precautions and exact sequence of
dismantling that you will follow. Specifically detail out the procedures for
masonry/partition walls, heavy floor beams, floor and roof arches and
RCC beams and columns.
10 marks2. In a construction site, explain the procedure for storing and preserving of
materials to maintain the quality with respect to a) Cement b) Timber c)
structural and reinforcement steel d) flammable materials like paints
varnishes and fuels
10 marks3. Explain the step wise procedure for calculating the costs for hourly
owning, operating and mobilsation of heavy construction equipment.
Compare investment factoring method and depreciation factoring method.
As a project manager, when will you opt for owning an equipment vs
renting an equipment?
10 marks4. While estimating masonry volume, what are the standard conventions and
rules followed for deducting structural bearings and openings from
masonry? Support your answers with sketches.
10 marks5. Why are painting coefficients used in woodwork estimation? Give
examples of at least five standard coefficients. How is the painting area of
structural steel sections determined?
10 marks6. Define “Float’ in CPM network analysis. Differential between Total float
(TF), Free Float (FF) and Interference Float (IF). Explain your answer with
the help of a mathematical example.
10 marks7. Describe Line of Balance (LOB) work schedule. What are the situations
when LOB is used and not traditional networks?
10 marks8. Write a short essay on “payments on account”, “final payment” and the
retention fund mechanism used to cover defective works, unpaid debts or
measurement disputes in a construction projects.
10 marks9. How are a contractor’s earnings, financing costs, networking capital and
overall risk profile affected by a) substituting fixed assets with current
assets b) substituting long term debt with current liabilities
10 marks10. Discuss the roles of sensitivity analysis and decision-tree analysis in
evaluating capital risks.
❓ Frequently Asked Questions (FAQs)
A: Immediately after payment, the download link will appear and be sent to your email.
Q: Is this hand-written or typed?
A: This is a professional typed computer PDF. You can use it as a reference for your handwritten submission.
Get the full solved PDF for just Rs. 15